Flexible job-shop scheduling problems with "AND"/"OR" precedence constraints
Year of publication: |
2012
|
---|---|
Authors: | Lee, Sanghyup ; Moon, Ilkyeong ; Bae, Hyerim ; Kim, Jion |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 50.2012, 7 (1.4.), p. 1979-2001
|
Subject: | ‘AND’/‘OR’ precedence constraints | flexible job-shop scheduling | genetic algorithm | heuristic | Tabu search | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Theorie | Theory | Algorithmus | Algorithm | Evolutionärer Algorithmus | Evolutionary algorithm | Flexibles Fertigungssystem | Flexible manufacturing system | Produktionssteuerung | Production control |
-
An effective genetic algorithm for flexible job-shop scheduling with overlapping in operation
Demir, Yunus, (2014)
-
Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops
Rohaninejad, Mohammad, (2016)
-
Zhang, Jiae, (2016)
- More ...
-
Flexible job-shop scheduling problems with AND/OR precedence constraints
Lee, Sanghyup, (2012)
-
Genetic algorithms for job shop scheduling problems with alternative routings
Moon, Ilkyeong, (2008)
-
BPM-based integration of supply chain process modeling, executing and monitoring
Bae, Hyerim, (2007)
- More ...