Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop
Year of publication: |
2003
|
---|---|
Authors: | Oguz, C. ; Fikret Ercan, M. ; Edwin Cheng, T. C. ; Fung, Y. F. |
Published in: |
European Journal of Operational Research. - Elsevier, ISSN 0377-2217. - Vol. 149.2003, 2, p. 390-403
|
Publisher: |
Elsevier |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Two-stage flow-shop scheduling problem with multiprocessor tasks at the first stage
Oǧuz, C., (1999)
-
Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop
Ogbreveuz, C., (2003)
-
Operations strategies with snobbish and strategic consumers
Lee, Chang Hwan, (2020)
- More ...