Heuristic algorithms for scheduling of a batch processor in automobile gear manufacturing
Year of publication: |
2011
|
---|---|
Authors: | Gokhale, Ravindra ; Mathirajan, M. |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 49.2011, 10/11 (15/1.5/6.), p. 2705-2728
|
Subject: | Automobilzulieferindustrie | Automotive supplier industry | Scheduling-Verfahren | Scheduling problem | Engpass | Bottleneck | Losgröße | Lot size | Heuristik | Heuristics | Algorithmus | Algorithm |
-
Kim, Seong-in, (2010)
-
The liquid crystal injection scheduling problem (LCISP)
Tai, Yu-ting, (2011)
-
A multi-objective optimisation algorithm for the hot rolling batch scheduling problem
Jia, S. J., (2013)
- More ...
-
Heuristic algorithms for scheduling of a batch processor in automobile gear manufacturing
Gokhale, Ravindra, (2011)
-
Sharma, Vikash, (2020)
-
Kumar, Ramesh, (2020)
- More ...