Heuristic for scheduling in a two-machine bicriteria dynamic flowshop with setup and processing times separated
Year of publication: |
2000
|
---|---|
Authors: | Su, Ling-Huey ; Chou, Fuh-Der |
Published in: |
Production planning & control : PPC. - London [u.a.] : Taylor & Francis, ISSN 0953-7287, ZDB-ID 10481977. - Vol. 11.2000, 8, p. 806-819
|
Saved in:
Saved in favorites
Similar items by person
-
A minimum-cost network flow approach to preemptive parallel-machine scheduling
Su, Ling-Huey, (2013)
-
Minimizing makespan in a two-stage system with flowshop and open shop
Su, Ling-Huey, (2005)
-
Chou, Fuh-Der, (2013)
- More ...