Heuristics for permutation flow shop scheduling with batch setup times
Year of publication: |
1996
|
---|---|
Authors: | Sotskov, Y.N. ; Tautenhahn, T. ; Werner, F. |
Published in: |
Operations-Research-Spektrum : Zeitschrift der Gesellschaft für Operations Research. - Berlin : Springer, ISSN 0171-6468, ZDB-ID 79364. - Vol. 18.1996, 2, p. 67-80
|
Saved in:
Saved in favorites
Similar items by person
-
Scheduling unit time open shops to minimize the weighted number of late jobs
Brucker, P., (1993)
-
On the Calculation of the Stability Radius of an Optimal or an Approximate Schedule
Sotskov, Y.N., (1997)
-
On the Calculation of the Stability Radius of an Optimal or an Approximate Schedule
Sotskov, Y.N., (1997)
- More ...