Hierarchy machine set-up for multi-pass lot scheduling at semiconductor assembly and test facilities
Year of publication: |
2019
|
---|---|
Authors: | Hur, Youngbum ; Bard, Jonathan F. ; Chacon, Rodolfo |
Published in: |
International journal of production research. - London [u.a.] : Taylor & Francis, ISSN 1366-588X, ZDB-ID 1485085-0. - Vol. 57.2019, 14, p. 4351-4370
|
Subject: | back-end operations | goal programming | GRASP | hierarchical set-ups | reentrant flow | semiconductor assembly and test facility | Theorie | Theory | Scheduling-Verfahren | Scheduling problem | Halbleiter | Semiconductor | Fließfertigung | Assembly-line production | Halbleiterindustrie | Semiconductor industry | Produktionsplanung | Production planning |
-
Daily scheduling of multi-pass lots at assembly and test facilities
Bard, Jonathan F., (2013)
-
Bard, Jonathan F., (2015)
-
Controlling work in process during semiconductor assembly and test operations
Zhang, Chuwen, (2017)
- More ...
-
Appointment scheduling at a multidisciplinary outpatient clinic using stochastic programming
Hur, Youngbum, (2020)
-
A stochastic optimization approach to shift scheduling with breaks adjustments
Hur, Youngbum, (2019)
-
Bard, Jonathan F., (2015)
- More ...