Integrated design and operation of remnant inventory supply chains under uncertainty
We consider the simultaneous design and operation of remnant inventory supply chains. Remnant inventory is generated when demand for various lengths of a product may be satisfied by existing inventory, or by cutting a large piece into smaller pieces. We formulate our problem as a two-stage stochastic mixed-integer program. In solving our stochastic program, we enhance the standard L-shaped method in two ways. Our computational experiments demonstrate that these enhancements are effective, dramatically reducing the solution time for large instances.
Year of publication: |
2011
|
---|---|
Authors: | Rajgopal, Jayant ; Wang, Zhouyan ; Schaefer, Andrew J. ; Prokopyev, Oleg A. |
Published in: |
European Journal of Operational Research. - Elsevier, ISSN 0377-2217. - Vol. 214.2011, 2, p. 358-364
|
Publisher: |
Elsevier |
Keywords: | Remnant inventory Stochastic programming Mixed integer programming |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Integrated design and operation of remnant inventory supply chains under uncertainty
Rajgopal, Jayant, (2011)
-
Integrated design and operation of remnant inventory supply chains under uncertainty
Rajgopal, Jayant, (2011)
-
Effective management policies for remnant inventory supply chains
Rajgopal, Jayant, (2009)
- More ...