Integrated scheduling of production and distribution with two competing agents
Year of publication: |
2024
|
---|---|
Authors: | Cheng, Bayi ; Gao, Junwei ; Zhou, Mi ; Chu, Wei |
Published in: |
Journal of the Operational Research Society. - London : Taylor and Francis, ISSN 1476-9360, ZDB-ID 2007775-0. - Vol. 75.2024, 9, p. 1826-1836
|
Subject: | approximation algorithms | Batch machine | delivery | scheduling | two competing agents | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Algorithmus | Algorithm |
-
Tang, Lixin, (2019)
-
An approximation algorithm for the bipartite traveling tournament problem
Hoshino, Richard, (2013)
-
Chen, Yong, (2021)
- More ...
-
Integrated optimization of design and production for personalized products
Cheng, Bayi, (2023)
-
Zhu, Wei, (2005)
-
Cheng, Bayi, (2019)
- More ...