Integrated scheduling using genetic algorithm with quasi-random sequences
Year of publication: |
2009
|
---|---|
Authors: | Okamoto, Azuma ; Gen, Mitsuo ; Sugawara, Mitsumasa |
Published in: |
International journal of manufacturing technology and management. - Milton Keynes [u.a.] : Inderscience Enterprises, ISSN 1368-2148, ZDB-ID 2037402-1. - Vol. 16.2009, 1/2, p. 147-165
|
Subject: | Scheduling-Verfahren | Scheduling problem | Evolutionärer Algorithmus | Evolutionary algorithm | Produktionswirtschaft | Production management | Innerbetrieblicher Transport | Internal transport |
-
Scheduling ASC and AGV considering direct, buffer, and hybrid modes for transferring containers
Wang, Yao-Zong, (2024)
-
Decision-making on multi-mould maintence in production scheduling
Wong, C. S., (2014)
-
Meziane, Mohammed El Amine, (2018)
- More ...
-
Integrated scheduling using genetic algorithm with quasi-random sequences
Okamoto, Azuma, (2009)
-
A hierarchical production planning system in the motor industry
Tsubone, Hitoshi, (1987)
-
An interactive production planning and scheduling system for a flow-type manufacturing process
Tsubone, Hitoshi, (1991)
- More ...