Integration of real option into medium/short-term mine planning and production scheduling
Year of publication: |
2009-10-17
|
---|---|
Authors: | Li, Shuxing ; Knights, Peter |
Other Persons: | Zhenfu Luo (contributor) |
Publisher: |
Elsevier |
Subject: | real options | mine planning | production scheduling |
-
Barrick's Turquoise Ridge gold mine optimizes underground production scheduling operations
Brickey, Andrea, (2021)
-
Barrick's Turquoise Ridge gold mine optimizes underground production scheduling operations
Brickey, Andrea, (2020)
-
Short-term planning optimization model for underground mines
Campeau, Louis-Pierre, (2020)
- More ...
-
Creating competitive advantage in mining: An illistrative comparison with the oil industry
Garcia, Jose, (2010)
-
Critical spare parts ordering decisions using conditional reliability and stochastic lead time
Godoy, David, (2011)
-
Doing more with less: How to improve maintainance labour utilisation
Knights, Peter, (2011)
- More ...