Inventory control of an item with a probabilistic replenishment lead time and a know supplier shutdown period
Year of publication: |
2011
|
---|---|
Authors: | Silver, Edward A. ; Zufferey, Nicolas |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 49.2011, 2/4 (15/15.1/2.), p. 923-947
|
Subject: | Lagerhaltungsmodell | Inventory model | Durchlaufzeit | Lead time | Zufallsvariable | Random variable | Heuristik | Heuristics | Losgröße | Lot size |
-
Evaluation of joint replenishment lot-sizing procedures in rolling horizon planning systems
Narayanan, Arunachalam, (2010)
-
Pei, Jun, (2015)
-
Lot size optimisation under pooled and unpooled scenarios in batch production system
Enns, Silvanus T., (2010)
- More ...
-
Bissoli, Dayan C., (2019)
-
Graph colouring approaches for a satellite range scheduling problem
Zufferey, Nicolas, (2008)
-
A solution method for a car fleet management problem with maintenance constraints
Hertz, Alain, (2009)
- More ...