Makespan and workstation utilization minimization in a flowshop with operations flexibility
Year of publication: |
2011
|
---|---|
Authors: | Ruiz-Torres, Alex J. ; Ho, Johnny C. ; Ablanedo-Rosas, José H. |
Published in: |
Omega : the international journal of management science. - Oxford [u.a.] : Elsevier, ISSN 0305-0483, ZDB-ID 124502-8. - Vol. 39.2011, 3, p. 273-282
|
Subject: | Fließfertigung | Assembly-line production | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Operations Research | Operations research |
-
Scheduling flow shops with blocking using a discrete self-organising migrating algorithm
Davendra, Donald, (2013)
-
Pereira, Jordi, (2018)
-
Pape, Tom, (2015)
- More ...
-
Makespan and workstation utilization minimization in a flowshop with operations flexibility
Ruiz-Torres, Alex J., (2011)
-
Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility
Ruiz-Torres, Alex J., (2010)
-
Ruiz-Torres, Alex J., (2012)
- More ...