Maximizing total job value on a single machine with job selection
Year of publication: |
September 2017
|
---|---|
Authors: | Eun, Joonyup ; Sung, Chang Sup ; Kim, Eun-Seok |
Published in: |
Journal of the Operational Research Society : OR. - Basingstoke, Hampshire : Palgrave, ISSN 0030-3623, ZDB-ID 716033-1. - Vol. 68.2017, 9, p. 998-1005
|
Subject: | scheduling | job value | stepwise value function | branch-and-bound | heuristic | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Theorie | Theory |
-
Scheduling jobs with values dependent on their completion times
Janiak, Adam, (2011)
-
Scheduling piecewise linear deteriorating jobs to minimize makespan in a two-machine flowshop
Jafari-Nodoushan, Abbasali, (2021)
-
Scheduling of two-machine flowshop with outsourcing lead-time
Kim, Eun-Seok, (2022)
- More ...
-
Predicting Daily Surgical Volumes Using Probabilistic Estimates of Providers’ Future Availability
Eun, Joonyup, (2020)
-
Eun, Joonyup, (2019)
-
Predicting daily surgical volumes using probabilistic estimates of providers' future availability
Eun, Joonyup, (2022)
- More ...