Minimal production level and reliability measurement for a maintainable production system under demand and budget constraints
Year of publication: |
2017
|
---|---|
Authors: | Yeh, Cheng-Ta ; Chang, Ping-Chen ; Chen, Chin-Yeu |
Published in: |
European journal of industrial engineering : EJIE. - Genevè : Inderscience Enterprises Ltd., ISSN 1751-5254, ZDB-ID 2384377-9. - Vol. 11.2017, 4, p. 526-547
|
Subject: | maintainable production system | MPS | minimal production level | stochastic capacity | reworking | maintenance reliability | preventive and perfect maintenance | activity-on-vertex predecessor-set technique | maintenance model | industrial engineering | Instandhaltung | Maintenance policy | Theorie | Theory | Produktionssystem | Manufacturing system | Produktivität | Productivity | Produktion | Production | Produktionsplanung | Production planning |
-
Ganesan, Sashikumaar, (2021)
-
Optimal run time for EPQ model with scrap, rework and stochastic breakdowns : a note
Chiu, Yuan-shyi Peter, (2014)
-
Rivera-Gómez, Héctor, (2018)
- More ...
-
Fuzzy-based system reliability of a lobour-intensive manufacturing network with repair
Chang, Ping-chen, (2015)
-
Lin, Yi-kuei, (2015)
-
Lin, Yi-kuei, (2012)
- More ...