Minimizing the total completion time in a distributed two stage assembly system with setup times
Year of publication: |
2014
|
---|---|
Authors: | Xiong, Fuli ; Xing, Keyi ; Wang, Feng ; Lei, Hang ; Han, Libin |
Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 47.2014, p. 92-105
|
Subject: | Scheduling | Distribution two-stage assembly flowshop | Hybrid meta-heuristics | Total completion time | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics | Fließfertigung | Assembly-line production | Just in Time | Just in time | Produktionssystem | Manufacturing system |
-
A reactive GRASP and Path Relinking for balancing reconfigurable transfer lines
Essafi, Mohamed, (2012)
-
Cheng, Mingbao, (2015)
-
Tajbakhsh, Zahra, (2014)
- More ...
-
Han, Libin, (2014)
-
Scheduling a hybrid assembly-differentiation flowshop to minimize total flow time
Xiong, Fuli, (2015)
-
Scheduling a hybrid assembly-differentiation flowshop to minimize total flow time
Xiong, Fuli, (2015)
- More ...