Minimizing total flow time in a two-machine flowshop problem with minimum makespan
Year of publication: |
2001
|
---|---|
Authors: | Gupta, Jatinder N. D. ; Neppalli, Venkata R. ; Werner, Frank |
Published in: |
International Journal of Production Economics. - Elsevier, ISSN 0925-5273. - Vol. 69.2001, 3, p. 323-338
|
Publisher: |
Elsevier |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Minimizing total flow time in a two-machine flowshop problem with minimum makespan
Gupta, Jatinder N.D., (2001)
-
On the solution of 2-machine flow shop problems with a common due date
Gupta, Jatinder N., (2000)
-
Minimizing the makespan on two identical parallel machines with mold constraints
Chung, Tsuiping, (2019)
- More ...