Multi-agent-based hierarchical collaborative scheduling in re-entrant manufacturing systems
Year of publication: |
1-15 December 2016
|
---|---|
Authors: | Zhang, Jie ; Wang, Xiaoxi |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 54.2016, 23/24 (1/15.12.), p. 7043-7059
|
Subject: | re-entrant manufacturing system | multi-agent systems | scheduling | contract net protocol | generalised partial global planning - contract net | Scheduling-Verfahren | Scheduling problem | Agentenbasierte Modellierung | Agent-based modeling | Simulation | Produktionssystem | Manufacturing system | Theorie | Theory | Produktionssteuerung | Production control | Produktionsplanung | Production planning |
-
Jiménez, Fernando, (2016)
-
Scheduling of jobs with cross families in two stage manufacturing systems
Nekoiemer, Nooshin, (2015)
-
Niaki, Mojtaba Khorram, (2017)
- More ...
-
Tool path optimisation method for large thin-wall part of spacecraft
Wang, Haichao, (2018)
-
Hot-line assembly strategy for connection fittings in 110kV intelligent substation
Tang, Mingdong, (2018)
-
Determinants of grassland use right transfer in institutional change : evidence from pastoral China
Lu Yu, (2012)
- More ...