Multi-objective job-shop scheduling with lot-splitting production
Year of publication: |
2010
|
---|---|
Authors: | Huang, Rong-hwa |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 124.2010, 1, p. 206-213
|
Subject: | Ant colony optimization | Produktionssteuerung | Production control | Scheduling-Verfahren | Scheduling problem | Losgröße | Lot size | Intelligenz | Intelligence | Heuristik | Heuristics | Algorithmus | Algorithm |
-
The liquid crystal injection scheduling problem (LCISP)
Tai, Yu-ting, (2011)
-
Chakaravarthy, G. Vijay, (2014)
-
Shahvari, Omid, (2017)
- More ...
-
Flexible job shop scheduling with due window—a two-pheromone ant colony approach
Huang, Rong-Hwa, (2013)
-
Hybrid decision model for information project selection
Yang, Chang-Lin, (2013)
-
Integration of corporate social responsibility into new product development
Yang, Chang-Lin, (2016)
- More ...