Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system
Year of publication: |
2010
|
---|---|
Authors: | Chen, Z. X. ; Sarker, B. R. |
Published in: |
Journal of the Operational Research Society : OR. - Basingstoke, Hampshire : Palgrave, ISSN 0030-3623, ZDB-ID 716033-1. - Vol. 61.2010, 11, p. 1654-1666
|
Subject: | Just in Time | Just in time | USA | United States | Theorie | Theory | Lieferkette | Supply chain |
-
Krüger, Rolf, (2002)
-
Schlanker Materialfluss mit Lean Production, Kanban und Innovationen
Dickmann, Philipp, (2006)
-
Dale, Barrie G., (2003)
- More ...
-
Optimum manpower models for a production system with varying production rates
Sarker, Bhaba R., (1986)
-
Optimal batch sizing in a multi-stage production system with rework consideration
Sarker, Bhaba R., (2008)
-
Optimal control of a multi-supplier and multi-buyer supply chain system with JIT delivery
Biswas, Pablo, (2021)
- More ...