Network construction problems with due dates
Year of publication: |
2015
|
---|---|
Authors: | Averbakh, Igor ; Pereira, Jordi |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 244.2015, 3 (1.8.), p. 715-729
|
Subject: | Scheduling | Network design | Network construction | Emergency restoration | Integrated network design and scheduling | Scheduling-Verfahren | Scheduling problem | Unternehmensnetzwerk | Business network | Netzwerk | Network | Lieferkette | Supply chain | Bauwirtschaft | Construction industry |
-
Tree optimization based heuristics and metaheuristics in network construction problems
Averbakh, Igor, (2021)
-
Lateness minimization in pairwise connectivity restoration problems
Averbakh, Igor, (2018)
-
Incremental network design with maximum flows
Kalinowski, Thomas, (2015)
- More ...
-
Exact and heuristic algorithms for the interval data robust assignment problem
Pereira, Jordi, (2011)
-
The Robust Set Covering Problem with interval data
Pereira, Jordi, (2013)
-
Tree optimization based heuristics and metaheuristics in network construction problems
Averbakh, Igor, (2021)
- More ...