On an IC wire bonding machine production-inventory problem with time value of money
Year of publication: |
1-15 May 2017
|
---|---|
Authors: | Gong, Dah-Chuan ; Kang, Jia-Lun ; Lin, Gary C. ; Hou, T. C. |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 55.2017, 9/10 (1/15.5.), p. 2431-2453
|
Subject: | imperfect production system | production time | time value | IC packaging industry | wire bonding machine | Durchlaufzeit | Lead time | Produktionsplanung | Production planning | USA | United States | Theorie | Theory |
-
Parallel dedicated machines scheduling with chain precedence constraints
Agnetis, Alessandro, (2012)
-
Optimizing planned lead times for enhancing performance of MRP systems
Milne, R. John, (2015)
-
On the representation of timing for different structures within MRP theory
Bogataj, Marija, (2012)
- More ...
-
Wang, Kung-jeng, (2010)
-
Wang, Kung-Jeng, (2010)
-
Conceptual design of a shop floor control system from IDEF0
Gong, Dah-Chuan, (1994)
- More ...