On the relationship between lean scheduling and economic performance in shipbuilding : a proposed model and comparative evaluation
Year of publication: |
2021
|
---|---|
Authors: | Shahsavar, Aria ; Sadeghi, J. Kiarash ; Shockley, Jeff ; Ojha, Divesh |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 239.2021, p. 1-14
|
Subject: | Lean | Overproduction | Practice-Based View Theory | Shipbuilding | Waiting | Waste | Schiffbau | Shipbuilding industry | Lean Production | Lean production | Lean Management | Lean management |
-
Lodbrok, Peer L., (1995)
-
Waste analysis framework for lean production : pilot study in a healthcare setting
Akrami, Zahra, (2021)
-
Demystifying the eighth lean waste : a knowledge waste scale
Klein, Leander Luiz, (2023)
- More ...
-
Sadeghi, J. Kiarash, (2020)
-
Sadeghi, J. Kiarash, (2023)
-
Ojha, Divesh, (2019)
- More ...