One-Operator, Two-Machine Open Shop and Flow Shop Scheduling with Setup Times for Machines and Maximum Lateness Objective
Year of publication: |
2003
|
---|---|
Authors: | Baki, F. ; Vickson, R.G. |
Published in: |
INFOR : information systems and operational research. - Ottawa : INFOR Journal, ISSN 0315-5986, ZDB-ID 1212606. - Vol. 41.2003, 4, p. 301-320
|
Saved in:
Saved in favorites
Similar items by person
-
An ant colony optimization metaheuristic for single-path multicommodity network flow problems
Li, X.-Y., (2010)
-
Optimal inspection sublots for deteriorating batch production
Vickson, R.G., (1998)
-
Batching and Sequencing of Components at a Single Facility
Vickson, R.G., (1993)
- More ...