Operational costs of A 13,000 solar home systems rural electrification programme
This paper presents an assessment and evaluation of the costs of operation and maintenance (O&M) in a real PV rural electrification (PVRE) programme, with the aim of characterizing its costs structure. Based on the extracted data of the 5-years operational costs of a private operator, the programme has been analyzed to take out the most relevant costs involved in the O&M phase as well as the comparative appraisal between the 3 main activities: installation, O&M and management. Through this study we try to answer to the new challenge of decentralized rural electrification based on larger programmes (with tens of thousands of SHSs) and longer maintenance and operation periods (at least 10 years).
Year of publication: |
2013
|
---|---|
Authors: | Carrasco, L.M. ; Narvarte, L. ; Lorenzo, E. |
Published in: |
Renewable and Sustainable Energy Reviews. - Elsevier, ISSN 1364-0321. - Vol. 20.2013, C, p. 1-7
|
Publisher: |
Elsevier |
Subject: | Photovoltaic | Rural electrification | Decentralized | Costs | Operation and maintenance |
Saved in:
Online Resource
Saved in favorites
Similar items by subject
-
Incentives for rural off grid electrification in Burkina Faso using LCOE
Ouedraogo, Bachir I., (2015)
-
Progress commercializing solar-electric power systems
DeLaquil, Pascal, (1996)
-
Assessment of hybrid renewable power sources for rural electrification in Malaysia
Fadaeenejad, M., (2014)
- More ...
Similar items by person