Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs
Year of publication: |
2021
|
---|---|
Authors: | Öztürk, Harun |
Published in: |
Operational research : an international journal. - Berlin : Springer, ISSN 1866-1505, ZDB-ID 2425760-6. - Vol. 21.2021, 1, p. 167-204
|
Subject: | Inventory | Production run time | Scrap | Rework | Random breakdowns | Inspection costs | Theorie | Theory | Lagerhaltungsmodell | Inventory model | Lagermanagement | Warehouse management | Produktionssystem | Manufacturing system | Produktionsplanung | Production planning |
-
Ganesan, Sashikumaar, (2021)
-
Sivashankari, C. K., (2023)
-
An economic manufacturing quantity model with probabilistic deterioration in a production system
Sarkar, Mitali, (2013)
- More ...
-
Öztürk, Harun, (2022)
-
Modeling an inventory problem with random supply, inspection and machine breakdown
Öztürk, Harun, (2019)
-
Öztürk, Harun, (2020)
- More ...