Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan
Year of publication: |
2011
|
---|---|
Authors: | Li, Shisheng ; Ng, C. T. ; Cheng, T. C. E. ; Yuan, Jinjiang |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 210.2011, 3 (1.5.), p. 482-488
|
Subject: | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Theorie | Theory |
-
Local search heuristics for single machine scheduling with batch set-up times
Crauwels, H. A., (1994)
-
Discrete lotsizing and scheduling with sequence dependent setup times and setup costs
Salomon, Marc, (1994)
-
A better heuristic for preemptive parallel machine scheduling with batch set-up times
Chen, Bo, (1992)
- More ...
-
Scheduling deteriorating jobs with CON/SLK due date assignment on a single machine
Li, Shisheng, (2011)
-
Group scheduling and due date assignment on a single machine
Li, Shisheng, (2011)
-
Fu, Ruyan, (2013)
- More ...