Parallel machine scheduling with completion-time-based criteria and sequence-dependent deterioration
Year of publication: |
2019
|
---|---|
Authors: | Ding, Junwen ; Shen, Liji ; Lü, Zhipeng ; Peng, Bo |
Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 103.2019, p. 35-45
|
Subject: | Parallel machine scheduling | Deteriorating effects | Ejection chain | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Branch-and-Bound | Branch and Bound | Heuristik | Heuristics | Algorithmus | Algorithm |
-
An exact algorithm for the preemptive single machine scheduling of equal-length jobs
Fomin, Artem, (2022)
-
Lee, Jun-ho, (2021)
-
Joo, B.-J., (2009)
- More ...
-
Energy aware scheduling in flexible flow shops with hybrid particle swarm optimization
Ding, Junwen, (2021)
-
The flexible job shop scheduling problem : a review
Dauzère-Péres, Stéphane, (2024)
-
A quality and distance guided hybrid algorithm for the vertex separator problem
Ding, Junwen, (2017)
- More ...