Performance evaluation of production lines with finite buffer capacity producing two different products
Year of publication: |
2006
|
---|---|
Authors: | Colledani, M. ; Matta, A. ; Tolio, T. |
Published in: |
Stochastic modeling of manufacturing systems : advances in design, performance evaluation, and control issues ; with 91 tables. - Berlin : Springer, ISBN 3-540-26579-1. - 2006, p. 77-97
|
Subject: | Fließfertigung | Assembly-line production | Scheduling-Verfahren | Scheduling problem | Theorie | Theory |
-
Complexity of the two-stage no-wait assembly problem with setup and removal times separated
Strusevič, Vitalij Aleksandrovič, (1991)
-
The two-stage assembly scheduling problem : complexity and aproximation
Van Wassenhove, Luk N., (1992)
-
Balancing assembly lines effectively
Scholl, Armin, (1997)
- More ...
-
Colledani, M., (2005)
-
Colledani, M., (2005)
-
Colledani, M., (2008)
- More ...