Extent: | xxxv, 324 p |
---|---|
Type of publication: | Book / Working Paper |
Language: | English |
Notes: | Includes bibliographical references Front Cover; Contents; Preface; Acknowledgment; About the Authors; List of Figures; Chapter 1: Introduction; Chapter 2: Saving Money with Homegrown Ideas; Chapter 3: Arbitrary Cost Down Approach; Chapter 4: The Isuzu Approach to Teardowns; Chapter 5: The DoD Approach; Chapter 6: Classical Value Analysis / Value Engineering Techniques; Chapter 7: Classical Techniques; Chapter 8: Saving Money with Six Sigma Projects; Chapter 9: Saving Money with Lean Manufacturing; Chapter 10: Saving Money with Optimization; Chapter 11: Regaining Money with Cost Recovery; Chapter 12: Other Methods Chapter 13: Finding Cost ReductionsChapter 14: When Cost Improvement Goes Wrong; Back Cover Electronic reproduction; Available via World Wide Web |
ISBN: | 978-1-4398-8725-7 ; 978-1-4398-8725-7 |
Source: | ECONIS - Online Catalogue of the ZBW |
Persistent link: https://www.econbiz.de/10011677324