Risk and uncertainty assessment in the development of strategy for forming the potential of dispatchable generation in the national power system of Ukraine
An inefficient generation and distribution infrastructure is a serious problem for the national power system of Ukraine. This situation makes it necessary to propose a radical new approach for developing a strategy to meet the demand for dispatchable power generation. Proposed options include: traditional centralised generation, decentralised and alternative energy sources, and use of so-called manoeuvrable loads, such as electrical heating systems. This paper describes an approach based on game theory and elements of fuzzy set theory to solve the problem, taking into account uncertainty of information and the multicriteria character of the problem.
Year of publication: |
2010
|
---|---|
Authors: | Prakhovnik, A.V. ; Popov, V.A. ; Nakhodov, V.F. |
Published in: |
International Journal of Global Energy Issues. - Inderscience Enterprises Ltd, ISSN 0954-7118. - Vol. 34.2010, 1/2/3/4, p. 132-138
|
Publisher: |
Inderscience Enterprises Ltd |
Subject: | power systems | dispatchable power generation | global energy | decentralised energy sources | manoeurable load | game theory | fuzzy sets | uncertainty | multicriteria decision making | MCDM | Ukraine | Central and Eastern Europe | CEE countries |
Saved in:
Online Resource
Saved in favorites
Similar items by subject
-
Railway construction project risk assessment techniques : systematic literature review
Gashaw, Tesfaye, (2023)
-
Supply chain risk prioritization : a multi-criteria based Intuitionistic Fuzzy TOPSIS approach
Mukherjee, Swarup, (2024)
-
A fuzzy PROMETHEE II method for the selection of reverse logistics provider
Jihen, Jlassi, (2012)
- More ...