River formation dynamics approach for sequence-dependent disassembly line balancing problem
Year of publication: |
2013
|
---|---|
Authors: | Kalayci, Can B. ; Gupta, Surendra M. |
Published in: |
Reverse supply chains : issues and analysis. - Boca Raton, Fla. [u.a.] : CRC Press, ISBN 978-1-4398-9902-1. - 2013, p. 289-311
|
Subject: | Fließfertigung | Assembly-line production | Scheduling-Verfahren | Scheduling problem | Mathematische Optimierung | Mathematical programming | Heuristik | Heuristics | USA | United States | Theorie | Theory |
-
Complexity of the two-stage no-wait assembly problem with setup and removal times separated
Strusevič, Vitalij Aleksandrovič, (1991)
-
A network-based shortest route model for parallel disassembly line balancing problem
Hezer, Seda, (2015)
-
Bentaha, Mohand Lounes, (2015)
- More ...
-
A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem
Kalayci, Can B., (2016)
-
Polat, Olcay, (2016)
-
Balancing a sequence-dependent disassembly line using simulated annealing algorithm
Kalayci, Can B., (2013)
- More ...