Robotic flowshop scheduling is strongly NP-complete
Year of publication: |
1997
|
---|---|
Authors: | Crama, Yves ; Klundert, Joris van de |
Institutions: | Maastricht : METEOR, Maastricht Research School of Economics of Technology and Organization |
Subject: | mathematical economics and econometrics |
-
Evolution, dynamics, and fixed points
Reinoud, Joosten, (1995)
-
Labor market dynamics when effort depends on wage growth comparisons
Croix,David,de la, (1996)
-
Routing trains through a railway station based on a Node Packing model
Zwaneveld, Peter J., (1997)
- More ...
-
The assembly of printed circuit boards : a case with multiple machines and multiple board types
Crama, Yves, (1995)
-
The approximability of tool management problems
Crama, Yves, (1996)
-
The Component retrieval problem in printed circuit board assembly
Crama, Yves, (1995)
- More ...