Scheduling flowline manufacturing cells with inter-cellular moves : non-permutation schedules and material flows in the cell scheduling problem
Year of publication: |
2020
|
---|---|
Authors: | Neufeld, J. S. ; Teucher, F. F. ; Buscher, Udo |
Published in: |
International journal of production research. - London [u.a.] : Taylor & Francis, ISSN 1366-588X, ZDB-ID 1485085-0. - Vol. 58.2020, 21, p. 6568-6584
|
Subject: | cell scheduling problem | Cellular manufacturing | group scheduling | inter-cellular moves | non-permutation schedules | sequence-independent setup times | Scheduling-Verfahren | Scheduling problem | Fertigungsinsel | Heuristik | Heuristics | Produktionssteuerung | Production control | Durchlaufzeit | Lead time |
-
Scheduling dynamic job shop manufacturing cells with family setup times : a simulation study
Klausnitzer, Armin, (2017)
-
Multi-degree cyclic flow shop robotic cell scheduling problem : ant colony optimization
Elmi, Atabak, (2016)
-
Statistical analysis of family based dispatching rules and preemption
Jing, Hao, (2021)
- More ...
-
Neufeld, J. S., (2015)
-
Henneberg, M., (2016)
-
Scheduling dynamic job shop manufacturing cells with family setup times: A simulation study
Klausnitzer, Armin, (2017)
- More ...