Scheduling trains as a blocking parallel-machine job shop scheduling problem
Year of publication: |
2009
|
---|---|
Authors: | Liu, Shi Qiang ; Kozan, Erhan |
Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 36.2009, 10, p. 2840-2852
|
Subject: | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | USA | United States | Theorie | Theory |
-
Complexity of the two-stage no-wait assembly problem with setup and removal times separated
Strusevič, Vitalij Aleksandrovič, (1991)
-
The two-stage assembly scheduling problem : complexity and aproximation
Van Wassenhove, Luk N., (1992)
-
Late acceptance hill-climbing for high school timetabling
Fonseca, George H. G., (2016)
- More ...
-
Scheduling a flow shop with combined buffer conditions
Liu, Shi Qiang, (2009)
-
A hybrid metaheuristic algorithm to optimise a real-world robotic cell
Liu, Shi Qiang, (2017)
-
Job shop scheduling with a combination of four buffering constraints
Liu, Shi Qiang, (2018)
- More ...