Scheduling trains with priorities : a no-wait blocking parallel-machine job-shop scheduling model
Year of publication: |
2011
|
---|---|
Authors: | Liu, Shi Qiang ; Kozan, Erhan |
Published in: |
Transportation science : a journal of the Institute for Operations Research and the Management Sciences. - Catonsville, MD : Transportation Science & Logistics Society of the Institute for Operations Research and the Management Sciences, ISSN 0041-1655, ZDB-ID 160958-0. - Vol. 45.2011, 2, p. 175-198
|
Subject: | Schienenverkehr | Railway transport | Scheduling-Verfahren | Scheduling problem | Mathematische Optimierung | Mathematical programming | Heuristik | Heuristics |
-
Approaches to a real-world train timetabling problem in a railway node
Cacchiani, Valentina, (2016)
-
Anghinolfi, Davide, (2017)
-
A Lagrangian heuristic for robustness, with an appllication to train timetabling
Cacciani, Valentina, (2012)
- More ...
-
Scheduling a flow shop with combined buffer conditions
Liu, Shi Qiang, (2009)
-
A hybrid metaheuristic algorithm to optimise a real-world robotic cell
Liu, Shi Qiang, (2017)
-
Job shop scheduling with a combination of four buffering constraints
Liu, Shi Qiang, (2018)
- More ...