Semiconductor final test scheduling with Sarsa(λ, k) algorithm
Year of publication: |
2011
|
---|---|
Authors: | Zhang, Zhicong ; Zheng, Li ; Hou, Forest ; Li, Na |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 215.2011, 2 (1.12.), p. 446-458
|
Subject: | Scheduling-Verfahren | Scheduling problem | Algorithmus | Algorithm | Halbleiter | Semiconductor | Halbleiterindustrie | Semiconductor industry | Durchlaufzeit | Lead time |
-
Qiao, Yan, (2015)
-
Controlling work in process during semiconductor assembly and test operations
Zhang, Chuwen, (2017)
-
Cycle time-oriented mid-term production planning for semiconductor wafer fabrication
Kriett, Phillip O., (2017)
- More ...
-
Semiconductor final test scheduling with Sarsa([lambda], k) algorithm
Zhang, Zhicong, (2011)
-
Semiconductor final test scheduling with Sarsa(λ, k) algorithm
Zhang, Zhicong, (2011)
-
Zhang, Zhicong, (2012)
- More ...