A simulation study of economic production quantity lot size to Kanban for a single line production system under various setup times with completion time as performance metric
Year of publication: |
2009
|
---|---|
Authors: | Moran, Terrence J. ; Troutt, Marvin D. |
Published in: |
Journal of business & economics research. - Littleton, Colo., ISSN 1542-4448, ZDB-ID 2442104-2. - Vol. 7.2009, 10, p. 1-8
|
Subject: | Losgröße | Lot size | Simulation | Produktionsplanung | Production planning | Theorie | Theory | Durchlaufzeit | Lead time | Produktionssystem | Manufacturing system | Just in Time | Just in time | Scheduling-Verfahren | Scheduling problem | Performance-Messung | Performance measurement |
-
Moran, Terrence J., (2012)
-
Task dispatching in reconfigurable seru production systems to minimise total earliness and tardiness
Lian, Jie, (2022)
-
An integrated producer-buyer relationship in the environment of EMQ and JIT production systems
Das Roy, Monami, (2012)
- More ...
-
Moran, Terrence J., (2008)
-
Moran, Terrence J., (2008)
-
Moran, Terrence J., (2012)
- More ...