Simultaneous structuring and scheduling of multiple projects with flexible project structures
Year of publication: |
2020
|
---|---|
Authors: | Hoffmann, Luise-Sophie ; Kellenbrink, Carolin ; Helber, Stefan |
Published in: |
Journal of business economics : JBE. - Berlin : Springer, ISSN 1861-8928, ZDB-ID 2059561-X. - Vol. 90.2020, 5/6, p. 679-711
|
Subject: | Multi-project scheduling | Flexible projects | Genetic algorithms | RCPSP | RCMPSP | Evolutionärer Algorithmus | Evolutionary algorithm | Scheduling-Verfahren | Scheduling problem | Projektmanagement | Project management |
-
Scheduling resource-constrained projects with a flexible project structure
Kellenbrink, Carolin, (2015)
-
Simultaneous structuring and scheduling of multiple projects with flexible project structures
Hoffmann, Luise-Sophie, (2020)
-
Rostami, Mohammad, (2020)
- More ...
-
Simultaneous structuring and scheduling of multiple projects with flexible project structures
Hoffmann, Luise-Sophie, (2020)
-
Scheduling resource-constrained projects with a flexible project structure
Kellenbrink, Carolin, (2013)
-
Quality- and profit-oriented scheduling of flexible resource-constrained projects
Kellenbrink, Carolin, (2014)
- More ...