Slab scheduling at parallel continuous casters
Year of publication: |
2015
|
---|---|
Authors: | Wichmann, Matthias ; Spengler, Thomas Stefan |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 170.2015, part b, p. 521-562
|
Subject: | Scheduling | Steel industry | GRASP |
-
Ammar, Mohamed Haykal, (2014)
-
A GRASP heuristic for slab scheduling at continuous casters
Wichmann, Matthias, (2014)
-
A GRASP meta-heuristic for the hybrid flowshop scheduling problem
González-Neira, Eliana M., (2017)
- More ...
-
A GRASP heuristic for slab scheduling at continuous casters
Wichmann, Matthias, (2014)
-
Ein genetischer Algorithmus zur Lösung des Slab Scheduling Problems
Wichmann, Matthias, (2013)
-
Techno-economic analysis and evaluation of recycling measures for iron and steel slags
Meyer, Christoph, (2013)
- More ...