Solving the multi objective flow shop scheduling problems using an improved NSGA-II
Year of publication: |
September 2018
|
---|---|
Authors: | Lebbar, Ghita ; El Abbassi, Ikram ; El Barkany, Abdellah ; Jabri, Abdelouahhab ; Darcherif, Abdel Moumen |
Published in: |
International journal of operations and quantitative management : IJOQM. - Houston, Tex. : INFOMS, ISSN 1082-1910, ZDB-ID 1290624-4. - Vol. 24.2018, 3, p. 211-230
|
Subject: | Permutation Flow Shop | Multi objective Optimization | Blocking Flow Shop | Makespan | Maximum Tardiness | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics | Evolutionärer Algorithmus | Evolutionary algorithm | Fließfertigung | Assembly-line production |
-
Minimising maximum tardiness in assembly flowshops with setup times
Aydilek, Asiye, (2017)
-
Tajbakhsh, Zahra, (2014)
-
A competitive memetic algorithm for the distributed two-stage assembly flow-shop scheduling problem
Deng, Jin, (2016)
- More ...
-
Heuristics for solving the intgrated planning and scheduling problem
Hassani, Zineb Ibn Majdoub, (2018)
-
Planning and scheduling problems of production systems : review, classification and opportunities
Hassani, Zineb Ibn Majdoub, (2019)
-
Cost of quality in healthcare : a case study in a clinical laboratory
Zahar, Mouna, (2016)
- More ...