Solving two production scheduling problems with sequence-dependent set-up times
Year of publication: |
1998-12
|
---|---|
Authors: | Noivo, Joao António ; Ramalhinho-Lourenço, Helena |
Institutions: | Department of Economics and Business, Universitat Pompeu Fabra |
Subject: | Production-scheduling | set-up times | priority dispatching rules |
Extent: | application/pdf |
---|---|
Series: | |
Type of publication: | Book / Working Paper |
Language: | English |
Classification: | C61 - Optimization Techniques; Programming Models; Dynamic Analysis ; M11 - Production Management ; L60 - Industry Studies: Manufacturing. General |
Source: |
-
Managing a Non-Cooperative Supply Chain with Limited Capacity
Parker, Rodney P., (2015)
-
Solving Two Production Scheduling Problems with Sequence-Dependent Set-Up Times
Noivo, João António, (2007)
-
A Recoverable Production Planning Model
Ramalhinho Dias Lourenço, Helena, (2003)
- More ...
-
Solving two production scheduling problems with sequence-dependent set-up times
Noivo, Joao António, (1998)
-
Juan, Angel A., (2012)
-
A simple optimised search heuristic for the job-shop scheduling problem
Fernandes, Susana, (2007)
- More ...