Some new problems on two-agent scheduling to minimize the earliness costs
Year of publication: |
2014
|
---|---|
Authors: | Cheng, Shuenn-Ren |
Published in: |
International Journal of Production Economics. - Elsevier, ISSN 0925-5273. - Vol. 156.2014, C, p. 24-30
|
Publisher: |
Elsevier |
Subject: | Single-machine | Two-agent | Maximum earliness cost | Total weighted earliness cost |
-
Some new problems on two-agent scheduling to minimize the earliness costs
Cheng, Shuenn-ren, (2014)
-
Two-agent single-machine scheduling with cumulative deterioration
Chen, Ren-Xia, (2019)
-
Scheduling Two-Agents with a Time-Dependent Deterioration to Minimize the Minsum Earliness Measures
Cheng, Shuenn-Ren, (2014)
- More ...
-
Investor protection and capital structure : international evidence
Cheng, Shuenn-ren, (2007)
-
A study on the factors affecting stock liquidity
Cheng, Shuenn-Ren, (2007)
-
Two-agent single-machine scheduling with release times and deadlines
Yin, Yunqiang, (2013)
- More ...