Study on multi-objective flexible job-shop scheduling problem considering energy consumption
Year of publication: |
2014
|
---|---|
Authors: | Jiang, Zengqiang ; Le, Zuo ; E, Mingcheng |
Published in: |
Journal of industrial engineering and management : JIEM. - Terrassa : Universitat Politècnica de Catalunya (UPC), ISSN 2013-0953, ZDB-ID 2495074-9. - Vol. 7.2014, 3, p. 589-604
|
Subject: | multi-objective scheduling | flexible job-shop scheduling | NSGA-II | energy consumption | blood variation | Scheduling-Verfahren | Scheduling problem | Energiekonsum | Energy consumption | Flexibles Fertigungssystem | Flexible manufacturing system | Produktionssteuerung | Production control | Evolutionärer Algorithmus | Evolutionary algorithm | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis | Algorithmus | Algorithm |
-
Ren, Weibo, (2021)
-
A memetic algorithm for multi-objective flexible job-shop problem with worker flexibility
Gong, Xuran, (2018)
-
Optimisation of berth and quay crane joint scheduling considering efficiency and energy consumption
Wen, Dusu, (2023)
- More ...
-
Study on multi-objective flexible job-shop scheduling problem considering energy consumption
Jiang, Zengqiang, (2014)
-
The evolution of production scheduling from Industry 3.0 through Industry 4.0
Jiang, Zengqiang, (2022)
- More ...