The impact of human consideration, schedule types and product mix on scheduling objectives for unpaced mixed-model assembly lines
Year of publication: |
2020
|
---|---|
Authors: | Ostermeier, Frederik Ferid |
Published in: |
International journal of production research. - London [u.a.] : Taylor & Francis, ISSN 1366-588X, ZDB-ID 1485085-0. - Vol. 58.2020, 14, p. 4386-4405
|
Subject: | flow shop scheduling | human consideration | product mix | schedule types | unpaced lines | Scheduling-Verfahren | Scheduling problem | Fließfertigung | Assembly-line production | Theorie | Theory | Durchlaufzeit | Lead time |
-
On the trade-offs between scheduling objectives for unpaced mixed-model assembly lines
Ostermeier, Frederik Ferid, (2022)
-
Minimising maximum tardiness in assembly flowshops with setup times
Aydilek, Asiye, (2017)
-
Scheduling flow shops with blocking using a discrete self-organising migrating algorithm
Davendra, Donald, (2013)
- More ...
-
On the trade-offs between scheduling objectives for unpaced mixed-model assembly lines
Ostermeier, Frederik Ferid, (2022)
- More ...