The third comprehensive survey on scheduling problems with setup times/costs
Year of publication: |
2015
|
---|---|
Authors: | Allahverdi, Ali |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 246.2015, 2 (16.10.), p. 345-378
|
Subject: | Scheduling | Review | Setup time | Setup cost | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Losgröße | Lot size | Produktionsplanung | Production planning | Heuristik | Heuristics |
-