The two-machine flowshop scheduling problem with sequence-independent setup times : new lower bounding strategies
Year of publication: |
2013
|
---|---|
Authors: | Gharbi, Anis ; Ladhari, Talel ; Msakni, Mohamed Kais ; Serairi, Mehdi |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 231.2013, 1 (16.11.), p. 69-78
|
Subject: | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics | Produktionssteuerung | Production control |
-
Rossi, Andrea, (2013)
-
Ozturk, Onur, (2012)
-
An efficient iterated local search algorithm for the total tardiness blocking flow shop problem
Ribas, Imma, (2013)
- More ...
-
Gharbi, Anis, (2013)
-
Gharbi, Anis, (2013)
-
An economic analysis of introducing autonomous ships in a shortâsea liner shipping network
Akbar, Abeera, (2020)
- More ...