Tool handling and scheduling in a two-machine flexible manufacturing cell
Year of publication: |
1996
|
---|---|
Authors: | Agnetis, A. ; Dror, M. ; Vakharia, A.J. ; Rossi, F. |
Published in: |
IIE transactions / Institute of Industrial Engineers, Norcross, Ga : industrial engineering and development. - Philadelphia, Pa : Taylor & Francis, ISSN 0569-5554, ZDB-ID 2460191. - Vol. 28.1996, 5, p. 425
|
Saved in:
Saved in favorites
Similar items by person
-
Assigning jobs to time frames on a single machine to minimize total tardiness
Agnetis, A., (1997)
-
Lot scheduling in a two-machine cell with swapping devices
Agnetis, A., (1996)
-
An Exact Algorithm for the Batch Sequencing Problem in a Two-Machine Flow Shop with Limited Buffer
Agnetis, A., (1998)
- More ...