Towards improving the performance of flexible manufacturing system: a case study
Year of publication: |
2010
|
---|---|
Authors: | Singholi, Ajay ; Chhabra, Deepti ; Ali, Mohammad |
Published in: |
Journal of industrial engineering and management : JIEM. - Terrassa : Universitat Politècnica de Catalunya (UPC), ISSN 2013-0953, ZDB-ID 2495074-9. - Vol. 3.2010, 1, p. 87-115
|
Subject: | flexible manufacturing system | performance parameters | production rate | makespan time | Industrie | Manufacturing industries | Flexibles Fertigungssystem | Flexible manufacturing system | Durchlaufzeit | Lead time | Scheduling-Verfahren | Scheduling problem | Performance-Messung | Performance measurement |
Type of publication: | Article |
---|---|
Type of publication (narrower categories): | Aufsatz in Zeitschrift ; Article in journal |
Language: | English |
Other identifiers: | 10.3926/jiem.v3n1.p87-115 [DOI] hdl:10419/188416 [Handle] |
Source: | ECONIS - Online Catalogue of the ZBW |
-
Jia, Zhiyang, (2019)
-
Towards improving the performance of flexible manufacturing system: A case study
Singholi, Ajay, (2010)
-
Ahmadi, Ehsan, (2016)
- More ...
-
Towards improving the performance of flexible manufacturing system: A case study
Singholi, Ajay, (2010)
-
Evaluating the effect of machine an routing flexibility on flexible manufacturing system performance
Singholi, Ajay, (2013)
-
Quality of Education in Madrasah
Ali, Mohammad, (2011)
- More ...