Transforming part-sequencing problems in a robotic cell into a GTSP
Year of publication: |
2011
|
---|---|
Authors: | Zahrouni, W. ; Kamoun, H. |
Published in: |
Journal of the Operational Research Society : OR. - Basingstoke, Hampshire : Palgrave, ISSN 0030-3623, ZDB-ID 716033-1. - Vol. 62.2011, 1, p. 114-123
|
Subject: | Roboter | Robot | Systemtransformation | Economic transition | Fertigungsinsel | Cellular manufacturing | Automatisierte Produktion | Automated manufacturing | Fließfertigung | Assembly-line production |
-
A hybrid metaheuristic algorithm to optimise a real-world robotic cell
Liu, Shi Qiang, (2017)
-
Multiple part-type scheduling in flexible robotic cells
Batur, G. Didem, (2011)
-
Scheduling rotationally arranged robotic cells served by a multi-functional robot
Foumani, Mehdi, (2014)
- More ...
-
The complexity of scheduling jobs in repetitive manufacturing systems
Kamoun, H., (1993)
-
The complexity of scheduling jobs in repetitive manufacturing systems
Kamoun, H., (1993)
-
Scheduling large robotic cells without buffers
Sriskandarajah, C., (1998)
- More ...