Twin-crane scheduling during seaside workload peaks with a dedicated handshake area
Year of publication: |
2022
|
---|---|
Authors: | Zey, Lennart ; Briskorn, Dirk ; Boysen, Nils |
Published in: |
Journal of scheduling : JOS. - Dordrecht [u.a.] : Springer Science + Business Media, ISSN 1099-1425, ZDB-ID 2012329-2. - Vol. 25.2022, 1, p. 3-34
|
Subject: | Port operations | Container logistics | Twin cranes | Crane scheduling | Scheduling-Verfahren | Scheduling problem | Containerterminal | Container terminal | Logistik | Logistics | Containerverkehr | Container transport | Lean Management | Lean management | Kran | Crane | Lieferkette | Supply chain |
-
An exact solution approach for scheduling cooperative gantry cranes
Kress, Dominik, (2019)
-
Gantry crane and shuttle car scheduling in modern rail-rail transshipment yards
Fedtke, Stefan, (2017)
-
Routing two stacking cranes with predetermined container sequences
Briskorn, Dirk, (2021)
- More ...
-
Twin-crane scheduling during seaside workload peaks with a dedicated handshake area
Zey, Lennart, (2021)
-
Resolving interferences of triple‐crossover‐cranes by determining paths in networks
Briskorn, Dirk, (2018)
-
Interference aware scheduling of triple-crossover-cranes
Briskorn, Dirk, (2020)
- More ...